Our renovation process puts you first, with a direct line of communication to Brightside’s owner & operator, Keith. From your first consultation, enjoy a genuine connection with Keith, knowing he will be with the project every day until it’s done. Get access to a comprehensive team of licensed tradespeople so you don’t have to look to anyone else to finish a job; have the right people with the right tools working together on your home.

Looking an 'L' shaped counter to a black sink and kitchen facet in from of a window.

The heart of the home. Turn your kitchen into a space you love to spend time and family and friends gather around.

A graphic of a house with an obvious basement area.

Refinish your basement and add a new floor to your home. A rec room, a movie theatre, whatever you envision, we can create.

Graphic showing three flooring pieces being put into place.

Visit our preferred showroom with Keith and find the right flooring system for your space. And, of course, have it expertly installed!

Customise Your Space.

A wooden staircase with one landing.
A graphic of a front door and side windows.

Make updates throughout your home to bring new life to tired rooms. And don’t be afraid to be creative with a new red front door!

A graphic of a bathroom vanity and mirror.

Transform your bathroom with an updated aesthetic and better layout so it functions for your family and brightens your mornings.

A graphic of a house with dotted lines around the garage and garage roof to show that it's part of a large project.

With structural engineering and a team of tradespeople at hand, we can bring your vision to life in your space. Dream big!

A graphic of a shower showing the tile pieces including a shower niche.

Customise any space. We specialize in bringing attention to detail to small and large spaces: showers, floors, bathrooms, kitchens and more!

The inside of a screen deck room focused on the stylish ceiling fan and wooden ceiling.
How Do I Get a Quote?

We start the process when you leave your information by filling out the form on our website; first, we get a quick overview of the project from you and schedule a site visit.

A site visit is often required to measure and gauge the project’s scope – a quote can be made from a single site visit. However, if structural or complex changes are required, it is a longer process as we consult with engineers on the right approach.

How Long Does It Take To Get a Quote?

It takes two weeks from the initial site visit and up to four weeks if there are complexities or required structural changes.

At Brightside Renovations. We aim for a two-week turnaround time for all quotes. It’s essential to get on site, measure correctly, and think thoroughly to get a quote that resembles the right approach to the project and is accurate, so there are no surprises along the way.

Once the site visit is complete, we tally the material and labor costs. If structural changes are required in the renovation, we consult with experts on engineering and potential drawings, which may take more time.

What Items of the Quote are The Final Cost?

Any labour a contractor provides directly is often a cost commitment, whereas supplies or costs associated with sub-trades are estimates and may not be final.

All costs associated with sub trades (electrical, HVAC, plumbing, glass installation, etc.) are subject to subcontractor costs at Brightside Renovations. Work provided directly by Brightside Renovations is part of our cost commitment. Unless additional work is added to the original quote, we will stick to this commitment no matter what happens, so you have peace of mind that these costs are final.

What Does a Quote Look Like?

A contractor’s quote will provide an overview of the project, detailing the labor costs for the outlined items and all materials needed. If the project calls for subcontractors, like plumbers or electricians, the quote will also include an estimate for their costs.

At Brightside Renovations, we clearly outline what will be done and what will be covered by the provided estimate. We value honesty and transparency and commit to the labour costs outlined in our quotes. This is why site visits are critical and proper measurements are required.

In What Order Do You Renovate a House?

 Renovating a house follows a logical sequence to ensure efficiency and avoid rework. The typical order is:
Planning & Permits – Define the project scope and secure necessary permits.
Demolition – Remove outdated or damaged materials.
Structural Work – Address framing, foundation, and any major structural changes.
Utilities – Rough-in plumbing, electrical, and HVAC before walls are closed.
Insulation & Drywall – Install insulation and finish walls.
Flooring & Paint – Apply paint before flooring to prevent damage.
Fixtures & Finishes – Install cabinets, trim, lighting, and final details.
Final Touches & Cleaning – Ensure everything is complete and ready for use.

What Can You Do to Keep the Budget Low When Renovating Your Home?

To keep renovation costs down:
Prioritize renovations – Focus on high-impact areas like kitchens and bathrooms.
Keep structural changes minimal – Avoid moving walls or relocating plumbing.
Use cost-effective materials – Look for quality alternatives to high-end finishes.
Refinish instead of replace – Repainting cabinets or refinishing floors can save money.
Plan thoroughly – Avoid last-minute changes that add costs.